The Orange Board of Education presented four significant facilities issues to the Board of Finance at their January 23rd meeting. Our Facilities Director, Mike Luzzi, led the detailed presentation. The issues we face are: new roofs at both Race Brook School and Peck Place; a new boiler at Turkey Hill School; and a driveway repair, and possible redesign, at Peck Place School. In each case, a failure at the facility could cause the district hardship, and we were asking the BOF for their help in redressing these problems before those potential hardships occur. Click through the slides below to view the full presentation.
No comments:
Post a Comment